You must be logged in to post comments on this site - please either log in or if you are not registered click here to signup
marshall2 minute(s) ago Living BBL fulltime? For a new homeowner the +s are pretty darn tempting. The -s are TCs closing the highway for a short time. Floods, fires closing the highways for days,weeks and months. Add in your PSPS and maybe someone says hell no. A law suit needs to happen to prevent the unnecessary power drops. Why is everyone putting up with this crap year after year. 3rd world country?
watchful47 minute(s) ago Will do. Thanks for the heads-up!
moco47 minute(s) ago No, i asked customer service thye just say they r working on it, no other info. Email their customer service on the website, very responsive.
watchful51 minute(s) ago Moco- Did they say where the completed rolling blackout schedule can be viewed? Would be great to be able to plan in advance.
moco56 minute(s) ago Power back in Moonridge, Power company email says they r working On a schedule for customers for rolling outages.
SCM ALERT🚨56 minute(s) ago Welcome AHan! That sucks! they need to rotate you in!!!!!
AHan1 hour(s) ago Haven't had power but motel 6 since 8ish last night. I feel like we're not getting a break.
Trua1 hour(s) ago I wonder how many additional homes could be powered up if all the unused vacation rental hot tubs were shut off? 🤔
SCM ALERT🚨2 hour(s) ago CITYOFBBL The concert scheduled for Saturday, June 27th in Moonridge is not affected by this power outage, and will go on as planned. Doors open at 4PM.
Dripjoy3 hour(s) ago Back on by airport
SCM ALERT🚨3 hour(s) ago BVES PSPS UPDATE Update – Rolling Outages in Effect Bear Valley Electric Service (BVES) continues to experience Southern California Edison (SCE)- initiated power interruptions as part of SCE's Public Safety Power Shutoff (PSPS) due to ongoing wildfire risk. As a result, electric service will rotate throughout the Big Bear Valley. Customers should expect temporary rolling outages as BVES manages its limited local generation resources and works to maintain the stability of the electric system. During this time, BVES is prioritizing power to critical infrastructure and essential public safety facilities, including emergency services and other critical community resources. Rolling outages are necessary to balance available generation while SCE crews work to safely inspect and restore the transmission lines that serve the Big Bear Valley
⚡WX ALERT⚡3 hour(s) ago Crissy, they said it could take up to 8hrs to restore all power once it's been turned back on by sce. It has not been turned back on yet. The PSPS alert runs through midnight tonight.
KD6VLN5 hour(s) ago Gilner Point power back on after 11 hours!
moco5 hour(s) ago No power moonridge
|